A Construction Surface Water Management Plan (CSWMP) is required by the Lead Local Flood Authority (the statutory consultee on large planning applications), in order to discharge a planning condition.
The local planning authority needs to approve your CSWMP in writing on how surface water and storm water will be managed during construction (including demolition and site clearance).
Download the Construction Surface Water Management Plan below. You will need to complete this and send to the local planning authority.
It needs to follow the guidance below to ensure construction does not increase flood risk, or pollution of watercourses in line with the River Basin Management Plan:
There's a statutory duty to ensure that surface water quality and quantity is managed throughout construction and prevent the impact of work off site.
The CSWMP needs to include: